Published tiers
| Tier | Typical investment | What it usually includes |
|---|---|---|
| Foundation | $120,000 to $175,000 | Classic rectangle or simple freeform, roughly 12×24 to 15×30, pebble or plaster interior, LED lighting, salt system, variable-speed equipment. |
| Signature | $175,000 to $325,000 | Our most-built tier. Custom shape, raised spa or wall, sun shelf, glass tile waterline, travertine deck, full smart automation and heating. |
| Monument | $325,000 to $1,000,000+ | Resort-grade: vanishing or perimeter-overflow edges, complex elevations, multiple water and fire features, natural stone, outdoor kitchens. |
The tiers describe scope and finish, not build quality. Every pool is engineered and built to the same standard.
Our current Volusia County builds range from about $200,000 to $550,000.
What a coastal lot adds
| Item | When it applies |
|---|---|
| Geotechnical report and pilings | Oceanfront lots where coastal sand will not carry the shell |
| Raised construction | Pools seaward of the control line, where the bottom is limited to 2 feet below grade |
| State coastal permit and engineering | Any pool, deck or fill seaward of the control line |
| Dewatering and hydrostatic relief | Beach sand and riverfront lots with a high water table |
| Flood-zone equipment placement | Lots in A, AE or VE zones |
| Wind-rated screen enclosure | Near the ocean, if you choose an enclosure as the safety barrier |
| Demolition, $8,000 to $20,000 | Replacing an existing pool |
| Poor soil or rock, $3,000 to $12,000 | Remediation, compaction or engineered footings |
| Tight access, $3,000 to $8,000 | Narrow beachside or downtown lots that need smaller equipment |
Your written Site Assessment tells you which of these apply to your lot before you commit to design. More detail in what an oceanfront pool costs.
How a project runs
Intro call
About your lot, your goals and your target investment. We confirm who permits your parcel.
Design consultation
By video. We pull up your lot and show real projects at your investment level.
Site visit and Site Assessment
We walk the property and send a written assessment within 2 business days, with a recommended design package. It is yours to keep. Everything up to here is free.
Design
Laser scan, a discovery session at our Sanford studio, 3D renders, a fly-through and VR, day and night. You leave with a design book and a fixed, itemized price held for 60 days.
Engineering and permits
Sealed third-party structural engineering, the local permit and, on the oceanfront, the state coastal permit.
Construction
A dedicated project manager and an update every week, with milestone payments as work is completed.
Handover
A final walk, Pool School on the automation, and a lifetime structural warranty on the gunite shell.
Most pools take 16 to 28 weeks from the first design meeting to the first swim, including 2 to 6 weeks of permitting. Oceanfront pools that need the state permit take longer.