Short answer: our custom pools start at $120,000, and our current Volusia County builds run from about $200,000 to $550,000. The long answer is about the handful of line items that only exist near the ocean.
What we are actually building right now
| Where | Project | Investment |
|---|---|---|
| Ormond Beach | Custom pool | $500K to $550K |
| Port Orange | Pool for a new custom home | $325K to $350K |
| Ponce Inlet | Oceanfront pool on pilings | $275K to $300K |
| New Smyrna Beach | Pool for a new custom home | $200K to $225K |
Those are real Volusia County projects from 2026, listed by town and range only. They are a better guide than any national average, because they include coastal soil, coastal permitting and luxury finishes.
Start with the tier
| Tier | Typical investment | What it usually includes |
|---|---|---|
| Foundation | $120,000 to $175,000 | Classic rectangle or simple freeform, roughly 12×24 to 15×30, pebble or plaster interior, LED lighting, salt system, variable-speed equipment. |
| Signature | $175,000 to $325,000 | Our most-built tier. Custom shape, raised spa or wall, sun shelf, glass tile waterline, travertine deck, full smart automation and heating. |
| Monument | $325,000 to $1,000,000+ | Resort-grade: vanishing or perimeter-overflow edges, complex elevations, multiple water and fire features, natural stone, outdoor kitchens. |
The tier describes the pool itself: size, shape, finishes, features. Oceanfront pools rarely land in Foundation, because raised construction and coastal engineering push them up even when the pool is simple.
Then add what the lot requires
These are the items that separate a coastal budget from an inland one. Your written Site Assessment tells you which apply before you pay for design.
- Geotechnical report. Borings on site to see whether the sand will carry the shell. On our Ponce Inlet project it was the longest wait before permitting could even start.
- Pilings. When the report calls for them. Ours called for 15 to 20 foot pilings under the shell.
- Raised construction. Seaward of the control line, the pool bottom can sit no more than two feet below grade, so walls are built up and finished on the outside.
- Engineering and the state permit. A sealed structural design, drainage details, and the Florida Department of Environmental Protection's coastal permit and fees, on top of the local permit.
- Dewatering. Beach sand and riverfront lots often have a high water table that has to be pumped down during excavation.
- Flood zone placement. Equipment and electrical set to the elevation your flood zone requires.
- A wind-rated enclosure. If you choose a screen enclosure as your safety barrier, it is engineered for coastal wind.
- Demolition. $8,000 to $20,000 to remove an existing pool before a rebuild.
- Tight access. $3,000 to $8,000 when a narrow beachside lot needs smaller equipment. Our Ponce Inlet site had a 6 foot access point.
Time is part of the cost
Inland, permitting is usually 2 to 6 weeks of a 16 to 28 week project. On the oceanfront, the state review runs in rounds and each response restarts the clock. Our Ponce Inlet project took about eleven months from signed contract to state permit. Changing the design after submission adds months, so we finish the design first.
What stays fixed
After design, you get a design book with a fixed, itemized price held for 60 days. It does not change unless you change the project. Payments during construction are milestones as work is completed. Design fees are 5 percent of your target investment with a $7,500 minimum, and on Pool Design projects the full fee is credited to construction when we build it.
How to budget without surprises
- Pick the tier your wish list fits.
- Get the survey and, if you are oceanfront, the soils report started early.
- Use the Site Assessment to add the coastal items that apply.
- Hold back a decision on extras such as an outdoor kitchen until you see the design priced.